Panel lines and block welding cells
Classify defects and predict defect risk at the arc, trim parameters inside the WPS envelope, route the joint to the right check. Metric: weld rework and class-rejected welds against the baseline.
Every yard already measures weld rework, fairing hours, coating non-conformance, dock days and schedule slips. Hullira lands on one of those numbers, on one process, with a baseline agreed in writing, and expands when it moves.
Illustrative scenario: Block B-214 · double-bottom block · panel line PL-2 · dock D1, one block, one approval gate
The first paid pilot targets one of these. The metric column is what the pilot would be judged on.
Classify defects and predict defect risk at the arc, trim parameters inside the WPS envelope, route the joint to the right check. Metric: weld rework and class-rejected welds against the baseline.
Predict distortion before welding, pick the sequence on the twin, plan line heating from the scan. Metric: fairing hours and out-of-tolerance blocks against the baseline.
Hold the environmental window and film thickness, pause cells when the window drifts, assemble PSPC evidence. Metric: coating non-conformance and re-coat area against the baseline.
Register both blocks against the twin, predict fit before the lift, guide shimming. Metric: dock hours per join and re-cut or re-fair events at erection.
Re-solve dock, crane and berth plans as blocks run early or late, flag schedule risk before it bites. Metric: dock utilisation and schedule slips against the baseline.
Check pipe, cable and machinery routes against the as-built block before the steel closes. Metric: clashes found before closing and outfitting rework.
Hullira is not a dashboard. Each agent closes a loop a yard already measures in rework, fairing hours, coating non-conformance and dock days. The tables show what each loop watches and what it is allowed to move.
Weld-pool, seam and bead cameras and the UT and X-ray streams are fused at the yard edge into a live estimate of defect risk per joint. Weldra trims parameters inside the qualified WPS envelope and routes the suspect joint to the right check before the block closes.
| Signal | Watches | Moves |
|---|---|---|
| Defect risk | Weld-pool and seam cameras, UT, X-ray | Wire feed, travel speed, heat input inside WPS |
| Seam sequence | Plan from the twin | Non-critical seams; class-critical seams under approval |
| Inspection routing | Risk score per joint | UT or X-ray queue, hold on the joint |
A weld-thermal FEA surrogate forecasts how each block moves for a given sequence, heat input, material and geometry. Fairix picks the sequence and back-step pattern before the arc strikes, and plans the line heating from the post-weld scan instead of from a shipwright's eye.
| Signal | Watches | Moves |
|---|---|---|
| Predicted distortion | FEA surrogate on the twin | Weld order, back-step pattern |
| As-built deviation | Laser scan and photogrammetry | Line-heating passes, under accuracy-control approval |
| Block tolerance | Per join from the erection plan | Hand-off to Aligna only inside tolerance |
Humidity, dew point and steel temperature are read continuously against the coating specification. Coatiq schedules blast and coat to an open window, pauses robotic cells when it drifts, reads dry-film thickness as it goes and assembles the PSPC evidence per area without a clipboard.
| Signal | Watches | Moves |
|---|---|---|
| Environmental window | Humidity, dew point, steel temperature | Blast and coat timing per area |
| Surface profile | Vision after blasting | Re-blast flag, cell pause |
| Film thickness | Dry-film gauge readings | Stripe coat and recoat inside the specification |
Both blocks are scanned and registered against the as-built twin before the crane moves. Aligna predicts the fit, issues shimming guidance, and Dockos re-solves the dock and crane plan as blocks run early or late, so a six-figure-a-day dock is not waiting on a block that will not fit.
| Signal | Watches | Moves |
|---|---|---|
| Fit at the joint | Point clouds of both blocks | Shimming and positioning guidance |
| Dock and crane plan | Block readiness, crane capacity, berths | Erection order and slots, under planner approval |
| Class evidence | Welds, scans, coating readings, approvals | Release or hold, written for sign-off |
Commercial newbuild, naval and defense, repair and conversion, multi-yard groups and the OEMs that ship into the yard. Most yards pick one process and one wedge, prove the number, then expand.
Series vessels with repeat block geometries, where weld rework and fairing hours are already counted. Weldra on the panel line or Fairix on the block type that distorts most.
Naval shipbuilders under classification-society and naval quality specs with program-office and cyber approvers. Weldra inspection and the Aligna twin, deployed on-prem, with the conformance record from day one.
Yards where the dock is the business and a coating or alignment fault is measured in dock days. Coatiq in the ballast tanks and Dockos on the dock plan.
Groups standardising weld, distortion and schedule models across sites, with the Enterprise tier, fleet-managed yard edge and per-yard private models.
Welding-robot, CAD/CAM, laser-scan, NDT and coating OEMs embedding Hullira-ready autonomy in what they already sell.
Every Hullira run is an ordered, inspectable sequence. This is run_4b7e19 on Block B-214 · double-bottom block · panel line PL-2 · dock D1. Scenario completes in 10 steps with one approval gate. Predicted distortion at the erection joint fell from 4.2 mm to 1.8 mm after a back-step sequence, one porosity precursor on seam S-31 was cleared inside the WPS envelope, the ballast-tank coat ran inside a 3.4 °C dew-point margin, and the block landed at 1.6 mm with its conformance record written.
Yard Orchestrator · Pulled the work package for B-214 from the yard MES: 46 plates, 212 seams under WPS-117, erection tolerance 2 mm at the D1 joint, PSPC-grade ballast-tank coating, erection slot on D1 in the dock plan. Locked the qualified WPS envelope and the class scope.
Ship Twin · Simulated 18 candidate weld sequences on the as-built twin with the weld-thermal surrogate, ranked on predicted distortion at the erection joint, crane reach on D1 and shift takt. Standing sequence predicts 4.2 mm; candidate #6 predicts 1.8 mm.
Cut-and-Profile · Released the nest for 46 plates on CL-1 with the fit-up gaps candidate #6 assumes. As-cut geometry logged per plate and handed to the panel line; material yield 91.4% against the nest plan.
Panel-and-Weld · Loaded the back-step sequence for the non-critical seams on PL-2 and set heat input and travel speed inside WPS-117. Weld-pool and seam cameras streaming on 12 channels.
Yard Orchestrator · Candidate #6 also re-orders two class-critical butt seams, S-31 and S-32. Sequence changes on class-critical seams stay with a human, so the step was held for the shift welding engineer and approved at 06:12:44.
Quality-and-Anomaly · Twelve weld cameras and the UT station fused at the yard edge. One porosity precursor on S-31 at 06:41 flagged and cleared by a 4% wire-feed trim inside the WPS-117 envelope; the joint was routed to UT and passed.
Fair-and-Form · Post-weld scan registered against the twin: 2.1 mm at the erection joint. Two line-heating passes planned on the inner bottom and executed by the fairing crew; re-scan read 1.8 mm, inside the 2 mm tolerance.
Blast-and-Coat · Ballast-tank blast and first coat scheduled to a window with steel temperature 3.4 °C above dew point. Dry-film thickness read 312 µm against a 280 µm minimum on the stripe coats; PSPC evidence assembled per area.
Schedule-and-Yard · Re-solved the D1 dock and crane plan with B-214 ready 6 hours early and a neighbouring block late: erection slot pulled forward one shift, crane G2 reassigned, no berth conflict. Planner approved the revised plan.
Erect-and-Align · Both blocks scanned on D1 and registered against the twin; fit predicted at 1.6 mm. Shimming guidance issued to the erection crew, block landed and welded out, final scan 1.6 mm. Conformance record written: welds, scans, coating readings, approvals and class evidence for B-214.
We have no customer quotes to show yet and will not invent any. These are the three roles in a yard we build for, and the problems they bring to the first meeting.
What this person is dealing with today
What this person is dealing with today
What this person is dealing with today
A yard does not go from paper travelers to unattended welding in one step. Hullira makes the level explicit, auditable and reversible at any time. The first release runs shadow mode, then assist mode, then supervised control on low-risk actions. Class-critical seam changes, lift plans and block release stay with named people.
| Level | What the agent does | What the human does | Where it sits in a pilot |
|---|---|---|---|
| L1 · Shadow | Reads weld, scan, NDT, coating, robot, crane and MES signals; predicts and recommends; writes nothing | Runs the process as today; compares predictions to NDT and surveyor outcomes | Shadow mode; the baseline is measured from the yard's own records |
| L2 · Assist | Proposes weld, fairing, coating, routing and schedule moves with evidence, confidence, envelope and rollback path | Approves each action in the review console | Assist mode, the remainder of the pilot |
| L3 · Supervised control | Executes pre-approved low-risk actions: inspection routing, coating pauses when a window drifts, weld parameters inside the WPS envelope, robot path variants tested in simulation | Approves class-critical seam changes, lift plans and block release | Graduated autonomy, after audited accuracy and ROI |
| L4 · Bounded | Supervised work sequencing and weld adaptation for qualified block types, across processes and yards | Sets the envelope; reviews the shift record and the evaluation results | Planned; after class, yard and insurer acceptance is earned |
Land on one workflow with a measured baseline. Expand by process, yard, group site and autonomy level. Outcome components are available on rework, dock time and schedule value. Annual prepay carries a 15 to 20% discount.
Weld, fairing or coating control, or weld-inspection AI, for one process. For yards validating ROI on the wedge.
The whole yard: cut and profile, panel and weld, fair and form, blast and coat, outfit and route, erect and align, quality and anomaly, schedule and yard, and the twin.
Multi-yard groups and naval programs standardising on Hullira, with custom weld, distortion and schedule models.
The questions production directors, welding engineers and class-compliance leads ask in the first meeting.
Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the qualified WPS, coating, dimensional and schedule constraints, and only at the autonomy level your yard has set. Design partners start in shadow mode, where Hullira writes nothing. Class-critical seam changes, lift plans and block release stay with named people.
Control returns to the robot controller, PLC or planner's last known-good state. Hullira is a supervisory layer on top of the controllers and interlocks you already run, never a replacement for them, so an outage degrades the process to its current way of running, not to a stop.
Advisory recommendations start from the physics-based twin, the WPS and the block drawings in the first weeks. Defect, distortion and coating prediction improve as block history and labelled NDT and surveyor outcomes accumulate. Onboarding is sized at 100 to 500 GPU-hours per yard and 50,000 to 250,000 synthetic variants per vessel class, both design targets.
Only if you choose cloud training. Drawings, WPS and PQR, naval data, process models and quality records are isolated per tenant and never used to train another customer's models. Security is defense and ITAR-aware, a fully on-prem deployment at the yard edge is available for naval and regulated yards, and federated learning across yards is planned and waits on data-rights agreements.
You are, the same as with any procedure change, which is why every write is policy-checked, bounded, logged and reversible, and why anything above your risk threshold waits for a named approver. The audit log records the request, the evidence, the WPS or class citation applied and the human decision.
A paid pilot on one process, scoped to a single wedge with a success metric written into the order form: weld rework, fairing hours, coating non-conformance, dock days or class-approval cycle time. Shadow mode comes first and the baseline is measured from your own records. We do not publish a pilot length because we have not run one.
Start with one welding, fairing, coating or erection process and one measurable baseline. A paid pilot on weld inspection, distortion control or coating assurance shows the number before you commit further.