Fit-up
The gap and alignment between two plates before welding. A fit-up error at the panel line becomes a weld defect, a distortion debt or an erection misfit downstream.
A glossary of the welding, distortion, coating and erection terms Hullira's agents work with, the standards the reasoning layer cites, and the inputs a yard brings to a pilot baseline. No white papers or calculators are published yet; this page is the reference we actually have.
Retrieval is tenant-isolated and every answer carries its citation. Citing a rule is not a class approval or a certification claim.
The welding, distortion, coating and erection terms that appear throughout the site.
The gap and alignment between two plates before welding. A fit-up error at the panel line becomes a weld defect, a distortion debt or an erection misfit downstream.
The energy a weld puts into the steel per unit length, set by current, voltage and travel speed. Too much distorts the panel; too little leaves lack of fusion.
Welding Procedure Specification and Procedure Qualification Record. The qualified envelope a weld must stay inside for class acceptance. Weldra never writes outside it.
Gas pockets trapped in the weld metal. A common cause of class rejection, visible to X-ray and UT and predictable from arc behaviour.
Weld metal that did not fuse with the base plate or the previous pass. Hidden under the bead, found by UT, and seeded by drift in parameters or fit-up.
The movement of steel after welding as the heat-affected metal shrinks. Measured in millimetres per panel and compounding across sub-blocks and blocks.
Controlled heating along a line to pull a distorted plate back toward true. Craft work, planned by Fairix from the post-weld scan.
Correcting a hull surface to its designed shape after welding, by line heating or mechanical means. The hours it takes are a yard's own measure of distortion.
The prefabricated hull sections, house-sized, that are built in the shop and joined in dock. The gaps in the Hullira mark are the joins between them.
Lifting a block into the dock and joining it to its neighbours. Measured in millimetres at the joint and in crane and dock hours.
IMO's Performance Standard for Protective Coatings. Sets surface preparation, environmental conditions and dry-film thickness for ballast tanks and other areas, with evidence per area.
The thickness of a cured coat, read with a gauge against the specification minimum. Coatiq reads it per area as the coat goes on.
The inputs for a baseline agreed in writing.
The pages that explain the mechanics.
How the yard-edge runtime, orchestrator, agents, twin and cloud loop fit together.
The write path, the audit record and the data governance.
What a pilot on weld inspection, distortion or coating would do and measure.
Six figures a day, autonomy as a dial, class quality before the shift.
The SDK and CLI design previews.
Tiers, the comparison table and the arithmetic a yard runs.
Every Hullira run is an ordered, inspectable sequence. This is run_4b7e19 on Block B-214 · double-bottom block · panel line PL-2 · dock D1. Scenario completes in 10 steps with one approval gate. Predicted distortion at the erection joint fell from 4.2 mm to 1.8 mm after a back-step sequence, one porosity precursor on seam S-31 was cleared inside the WPS envelope, the ballast-tank coat ran inside a 3.4 °C dew-point margin, and the block landed at 1.6 mm with its conformance record written.
Yard Orchestrator · Pulled the work package for B-214 from the yard MES: 46 plates, 212 seams under WPS-117, erection tolerance 2 mm at the D1 joint, PSPC-grade ballast-tank coating, erection slot on D1 in the dock plan. Locked the qualified WPS envelope and the class scope.
Ship Twin · Simulated 18 candidate weld sequences on the as-built twin with the weld-thermal surrogate, ranked on predicted distortion at the erection joint, crane reach on D1 and shift takt. Standing sequence predicts 4.2 mm; candidate #6 predicts 1.8 mm.
Cut-and-Profile · Released the nest for 46 plates on CL-1 with the fit-up gaps candidate #6 assumes. As-cut geometry logged per plate and handed to the panel line; material yield 91.4% against the nest plan.
Panel-and-Weld · Loaded the back-step sequence for the non-critical seams on PL-2 and set heat input and travel speed inside WPS-117. Weld-pool and seam cameras streaming on 12 channels.
Yard Orchestrator · Candidate #6 also re-orders two class-critical butt seams, S-31 and S-32. Sequence changes on class-critical seams stay with a human, so the step was held for the shift welding engineer and approved at 06:12:44.
Quality-and-Anomaly · Twelve weld cameras and the UT station fused at the yard edge. One porosity precursor on S-31 at 06:41 flagged and cleared by a 4% wire-feed trim inside the WPS-117 envelope; the joint was routed to UT and passed.
Fair-and-Form · Post-weld scan registered against the twin: 2.1 mm at the erection joint. Two line-heating passes planned on the inner bottom and executed by the fairing crew; re-scan read 1.8 mm, inside the 2 mm tolerance.
Blast-and-Coat · Ballast-tank blast and first coat scheduled to a window with steel temperature 3.4 °C above dew point. Dry-film thickness read 312 µm against a 280 µm minimum on the stripe coats; PSPC evidence assembled per area.
Schedule-and-Yard · Re-solved the D1 dock and crane plan with B-214 ready 6 hours early and a neighbouring block late: erection slot pulled forward one shift, crane G2 reassigned, no berth conflict. Planner approved the revised plan.
Erect-and-Align · Both blocks scanned on D1 and registered against the twin; fit predicted at 1.6 mm. Shimming guidance issued to the erection crew, block landed and welded out, final scan 1.6 mm. Conformance record written: welds, scans, coating readings, approvals and class evidence for B-214.
A yard does not go from paper travelers to unattended welding in one step. Hullira makes the level explicit, auditable and reversible at any time. The first release runs shadow mode, then assist mode, then supervised control on low-risk actions. Class-critical seam changes, lift plans and block release stay with named people.
| Level | What the agent does | What the human does | Where it sits in a pilot |
|---|---|---|---|
| L1 · Shadow | Reads weld, scan, NDT, coating, robot, crane and MES signals; predicts and recommends; writes nothing | Runs the process as today; compares predictions to NDT and surveyor outcomes | Shadow mode; the baseline is measured from the yard's own records |
| L2 · Assist | Proposes weld, fairing, coating, routing and schedule moves with evidence, confidence, envelope and rollback path | Approves each action in the review console | Assist mode, the remainder of the pilot |
| L3 · Supervised control | Executes pre-approved low-risk actions: inspection routing, coating pauses when a window drifts, weld parameters inside the WPS envelope, robot path variants tested in simulation | Approves class-critical seam changes, lift plans and block release | Graduated autonomy, after audited accuracy and ROI |
| L4 · Bounded | Supervised work sequencing and weld adaptation for qualified block types, across processes and yards | Sets the envelope; reviews the shift record and the evaluation results | Planned; after class, yard and insurer acceptance is earned |
A weld pool is decided in milliseconds and a dock waits by the hour. Perception has to be local, deterministic and fast, so Hullira runs GPU inference at the yard edge and keeps training, simulation and optimisation in the cloud or on-prem.
6 to 24 cameras per process area plus UT, X-ray, thermal, laser-scan, photogrammetry, robot and coating-instrument streams fused at the yard edge. Sub-50 ms weld alerts and sub-150 ms coating or scan prompts are the design targets. Jetson Thor is planned for higher camera density.
Weld-defect, distortion-risk, coating-risk, point-cloud and schedule-risk models behind one orchestrator at the yard edge, versioned with rollback, routed by latency, tenant, sensitivity and cost.
Weld-defect vision, UT and X-ray classification, NeMo class-rule reasoning and weld-thermal FEA surrogates fine-tuned per tenant: 100 to 500 GPU-hours per yard during onboarding, then monthly retraining from engineer corrections and class outcomes. Dedicated training capacity is planned.
Block erection, weld sequence, robot reach, crane paths and yard layout simulated before the shift, as-built against as-designed. GPU weld-thermal and structural FEA is the workload; physics-informed surrogates rank plans at shift cadence.
Rare weld defects, coating failures, distortion modes, occluded seams and erection misalignment cases generated and validated against real NDT and scan distributions before promotion. 50k to 250k variants per vessel class is the target. Planned.
Dock, crane and berth schedules, work-package sequencing, yard logistics and erection order, re-solved as progress changes.
Robotic weld, blast, coat and inspection cells and crawler or drone hull inspection, with paths validated in simulation before they run next to a hull.
Telemetry ETL across weld parameters, scans, NDT results, coating readings, non-conformance and schedule history, for retraining, drift detection and rework, dock-time and schedule benchmarks.
WPS and PQR, class-rule, PSPC, cyber and human-approval policies enforced before any action writes back to robots, MES, QA or work packages; retrieval with citations and tenant isolation.
The questions production directors, welding engineers and class-compliance leads ask in the first meeting.
Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the qualified WPS, coating, dimensional and schedule constraints, and only at the autonomy level your yard has set. Design partners start in shadow mode, where Hullira writes nothing. Class-critical seam changes, lift plans and block release stay with named people.
Control returns to the robot controller, PLC or planner's last known-good state. Hullira is a supervisory layer on top of the controllers and interlocks you already run, never a replacement for them, so an outage degrades the process to its current way of running, not to a stop.
Advisory recommendations start from the physics-based twin, the WPS and the block drawings in the first weeks. Defect, distortion and coating prediction improve as block history and labelled NDT and surveyor outcomes accumulate. Onboarding is sized at 100 to 500 GPU-hours per yard and 50,000 to 250,000 synthetic variants per vessel class, both design targets.
Only if you choose cloud training. Drawings, WPS and PQR, naval data, process models and quality records are isolated per tenant and never used to train another customer's models. Security is defense and ITAR-aware, a fully on-prem deployment at the yard edge is available for naval and regulated yards, and federated learning across yards is planned and waits on data-rights agreements.
You are, the same as with any procedure change, which is why every write is policy-checked, bounded, logged and reversible, and why anything above your risk threshold waits for a named approver. The audit log records the request, the evidence, the WPS or class citation applied and the human decision.
A paid pilot on one process, scoped to a single wedge with a success metric written into the order form: weld rework, fairing hours, coating non-conformance, dock days or class-approval cycle time. Shadow mode comes first and the baseline is measured from your own records. We do not publish a pilot length because we have not run one.
Start with one welding, fairing, coating or erection process and one measurable baseline. A paid pilot on weld inspection, distortion control or coating assurance shows the number before you commit further.