Three walk-throughs. All of them labelled scenarios.
Hullira has no customer results yet, so this page does not pretend to. Each scenario describes a hypothetical process, what the agent would do at each autonomy level, and the metric table the pilot would fill in. When a design partner signs, the first real case study replaces the first scenario.
Illustrative scenario: Block B-214 · double-bottom block · panel line PL-2 · dock D1, one block, one approval gate
Catching porosity on the panel line before the surveyor does
A hypothetical panel line with three robotic welding cells, an in-line UT station and periodic X-ray by a service house. Today a class-rejected weld is found days after the block closes, ground out and re-welded.
What the agent would do
- Shadow mode. Weldra reads weld-pool and seam cameras, UT files and robot parameters, scores defect risk per joint and compares its calls with the surveyor's.
- Assist mode. Weldra proposes parameter trims inside the WPS envelope and inspection routing; the welding engineer approves each one.
- Supervised control. parameter trims inside WPS execute automatically; sequence changes on class-critical seams stay with the engineer.
| Metric | How | Result |
|---|---|---|
| Class-rejected welds | per block, before and during | to be measured |
| Weld rework hours | grind-out and re-weld per block | to be measured |
| Detection accuracy | against UT, X-ray and surveyor baseline | to be measured |
| Inspection escapes | per block | to be measured |
No result is claimed. The metric table is what the pilot would record.
Holding a repeat block inside tolerance without the fairing crew
A hypothetical double-bottom block type built in series, scanned after welding, faired by line heating when it is out of tolerance. Today fairing hours per block are the yard's own measure of distortion.
What the agent would do
- Shadow mode. Fairix predicts distortion per block from the planned sequence and compares the prediction with the post-weld scan.
- Assist mode. Fairix proposes a weld order and back-step pattern on the twin and a line-heating plan from the scan; the accuracy-control engineer approves.
- Supervised control. sequence choices for non-critical seams execute automatically; class-critical seams and line heating stay with people.
| Metric | How | Result |
|---|---|---|
| Fairing hours | per block, before and during | to be measured |
| Out-of-tolerance blocks | per block type at the erection joint | to be measured |
| Prediction accuracy | predicted against scanned distortion | to be measured |
| Dock hours at erection | per join | to be measured |
No result is claimed. The metric table is what the pilot would record.
Coating a ballast tank inside the window, with the PSPC evidence written
A hypothetical ballast-tank coating area with environmental sensors, dry-film gauges and a robotic blast cell. Today crews chase the humidity window by hand and PSPC evidence is assembled on paper.
What the agent would do
- Shadow mode. Coatiq reads humidity, dew point, steel temperature, surface-profile cameras and gauge readings, and compares its window and thickness calls with the coating inspector's.
- Assist mode. Coatiq proposes blast and coat timing per area and flags thickness shortfalls; the coating inspector approves.
- Supervised control. cell pauses when a window drifts execute automatically; recoat decisions and PSPC sign-off stay with people.
| Metric | How | Result |
|---|---|---|
| Coating non-conformance | per PSPC area, before and during | to be measured |
| Re-coat area | square metres per tank | to be measured |
| Window compliance | share of coat applied inside the window | to be measured |
| PSPC evidence completeness | share of areas with a full record | to be measured |
No result is claimed. The metric table is what the pilot would record.
The reference scenario, step by step
Every Hullira run is an ordered, inspectable sequence. This is run_4b7e19 on Block B-214 · double-bottom block · panel line PL-2 · dock D1. Scenario completes in 10 steps with one approval gate. Predicted distortion at the erection joint fell from 4.2 mm to 1.8 mm after a back-step sequence, one porosity precursor on seam S-31 was cleared inside the WPS envelope, the ballast-tank coat ran inside a 3.4 °C dew-point margin, and the block landed at 1.6 mm with its conformance record written.
-
01
ingest.package
SUCCEEDED
0.8 s
Yard Orchestrator · Pulled the work package for B-214 from the yard MES: 46 plates, 212 seams under WPS-117, erection tolerance 2 mm at the D1 joint, PSPC-grade ballast-tank coating, erection slot on D1 in the dock plan. Locked the qualified WPS envelope and the class scope.
-
02
twin.simulate
SUCCEEDED
1 m 12 s
Ship Twin · Simulated 18 candidate weld sequences on the as-built twin with the weld-thermal surrogate, ranked on predicted distortion at the erection joint, crane reach on D1 and shift takt. Standing sequence predicts 4.2 mm; candidate #6 predicts 1.8 mm.
-
03
cut.nest
SUCCEEDED
3 m 40 s
Cut-and-Profile · Released the nest for 46 plates on CL-1 with the fit-up gaps candidate #6 assumes. As-cut geometry logged per plate and handed to the panel line; material yield 91.4% against the nest plan.
-
04
weld.sequence
SUCCEEDED
2 m 05 s
Panel-and-Weld · Loaded the back-step sequence for the non-critical seams on PL-2 and set heat input and travel speed inside WPS-117. Weld-pool and seam cameras streaming on 12 channels.
-
05
approve.human
APPROVAL
58 s
Yard Orchestrator · Candidate #6 also re-orders two class-critical butt seams, S-31 and S-32. Sequence changes on class-critical seams stay with a human, so the step was held for the shift welding engineer and approved at 06:12:44.
-
06
inspect.fuse
SUCCEEDED
continuous
Quality-and-Anomaly · Twelve weld cameras and the UT station fused at the yard edge. One porosity precursor on S-31 at 06:41 flagged and cleared by a 4% wire-feed trim inside the WPS-117 envelope; the joint was routed to UT and passed.
-
07
fair.lineheat
SUCCEEDED
4 m 30 s
Fair-and-Form · Post-weld scan registered against the twin: 2.1 mm at the erection joint. Two line-heating passes planned on the inner bottom and executed by the fairing crew; re-scan read 1.8 mm, inside the 2 mm tolerance.
-
08
coat.window
SUCCEEDED
continuous
Blast-and-Coat · Ballast-tank blast and first coat scheduled to a window with steel temperature 3.4 °C above dew point. Dry-film thickness read 312 µm against a 280 µm minimum on the stripe coats; PSPC evidence assembled per area.
-
09
dock.reoptimise
SUCCEEDED
41 s
Schedule-and-Yard · Re-solved the D1 dock and crane plan with B-214 ready 6 hours early and a neighbouring block late: erection slot pulled forward one shift, crane G2 reassigned, no berth conflict. Planner approved the revised plan.
-
10
erect.align
SUCCEEDED
1 h 48 m
Erect-and-Align · Both blocks scanned on D1 and registered against the twin; fit predicted at 1.6 mm. Shimming guidance issued to the erection crew, block landed and welded out, final scan 1.6 mm. Conformance record written: welds, scans, coating readings, approvals and class evidence for B-214.
The agent shows its work
Every tool invocation, argument and result is written to an append-only, human-readable log, and every reasoning step is expandable. Nothing about a run is hidden from the yard or the surveyor.
- 06:04:10mes.read_packages({ block: "B-214", dock: "D1" })
- 06:04:11ok 46 plates · 212 seams · WPS-117 · 2 mm at D1 joint
- 06:04:12twin.simulate({ candidates: 18, objective: "distortion, reach, takt" })
- 06:05:24ok best #6 · joint 1.8 mm · reach ok · takt +0.4 h
- 06:05:25policy.evaluate({ plan: 6, autonomy: "L2+" })
- 06:05:25ok 8 writes permitted · class-critical seam order requires human approval
- 06:05:26cutter.set_program({ machine: "CL-1", nest: "B214-N3" })
- 06:09:06ok 46 plates cut · yield 91.4% · geometry logged
- 06:09:07weld.set_sequence({ line: "PL-2", plan: 6, scope: "non-critical" })
- 06:11:12ok back-step loaded · heat input inside WPS-117
- 06:11:46approval.request({ action: "seam_sequence", seams: ["S-31", "S-32"] })
- 06:12:44ok approved by shift welding engineer · logged
- 06:12:45sensors.fuse({ cams: 12, ut: true })
- 06:41:03precursor: porosity risk 0.57 · seam S-31 · 1.2 m from start
- 06:41:04robot.set_parameters({ cell: "PL-2.R3", wire_feed: "-4%", within: "WPS-117" })
- 06:41:19ok porosity risk 0.57 → 0.09 · S-31 routed to UT · passed
- 09:20:30scan.register({ block: "B-214", stage: "post-weld" })
- 09:21:02ok joint 2.1 mm · 2 line-heat passes planned
- 11:02:40ok re-scan 1.8 mm · inside 2 mm tolerance
- 11:02:41coat.schedule_area({ area: "BT-214", spec: "PSPC" })
- 11:02:42ok window open · steel 3.4 °C above dew point · DFT 312 µm
- 11:03:00cuopt.solve({ dock: "D1", horizon: "14d" })
- 11:03:41ok slot pulled forward 1 shift · crane G2 reassigned · planner approved
- 14:30:12align.guide({ block: "B-214", dock: "D1" })
- 16:18:40ok landed 1.6 mm · conformance record written · scenario complete
Reasoning trace
Plan, thought, action, observation, exactly as the orchestrator would record it.
GoalBuild and erect B-214 inside WPS-117, hold the erection joint …
Build and erect B-214 inside WPS-117, hold the erection joint within 2 mm, coat the ballast tank inside the PSPC window, and land it on D1 by the dock plan.
PlanSimulate weld sequences on the twin first. Lead with the seque…
Simulate weld sequences on the twin first. Lead with the sequence because distortion is decided at the arc, then cut to the fit-up the sequence assumes, then weld and inspect continuously. Scan after welding and fair only what the scan shows. Hold any class-critical seam change for a human.
ThoughtThe standing sequence welds the inner bottom straight through …
The standing sequence welds the inner bottom straight through and predicts 4.2 mm at the joint, which means fairing hours and a risk to the D1 slot. A back-step sequence with two class-critical seams re-ordered predicts 1.8 mm at a cost of 0.4 hours of takt.
Actiontwin.simulate(candidates=18) returns plan #6: back-step on the…
twin.simulate(candidates=18) returns plan #6: back-step on the non-critical seams, S-31 and S-32 re-ordered, heat input held inside WPS-117.
ObservationPlan #6 predicts 1.8 mm at the joint and clear crane reach on …
Plan #6 predicts 1.8 mm at the joint and clear crane reach on D1. Three candidates scored lower on distortion but moved heat input outside the WPS envelope and were discarded.
ActionExecute plan #6: eight bounded writes permitted on cutting, no…
Execute plan #6: eight bounded writes permitted on cutting, non-critical weld sequence, parameters inside WPS, coating windows and dock plan; the class-critical seam order routed to the shift welding engineer.
ObservationPorosity precursor on S-31 at 06:41:03. A 4% wire-feed trim in…
Porosity precursor on S-31 at 06:41:03. A 4% wire-feed trim inside WPS-117 cleared it in 15 s; the joint was routed to UT and passed. Post-weld scan 2.1 mm, two line-heating passes brought it to 1.8 mm.
OutcomeScenario complete. Block landed at 1.6 mm, ballast tank coated…
Scenario complete. Block landed at 1.6 mm, ballast tank coated inside the window, conformance record written for class review.
Four levels, set per agent and per tag
A yard does not go from paper travelers to unattended welding in one step. Hullira makes the level explicit, auditable and reversible at any time. The first release runs shadow mode, then assist mode, then supervised control on low-risk actions. Class-critical seam changes, lift plans and block release stay with named people.
| Level | What the agent does | What the human does | Where it sits in a pilot |
|---|---|---|---|
| L1 · Shadow | Reads weld, scan, NDT, coating, robot, crane and MES signals; predicts and recommends; writes nothing | Runs the process as today; compares predictions to NDT and surveyor outcomes | Shadow mode; the baseline is measured from the yard's own records |
| L2 · Assist | Proposes weld, fairing, coating, routing and schedule moves with evidence, confidence, envelope and rollback path | Approves each action in the review console | Assist mode, the remainder of the pilot |
| L3 · Supervised control | Executes pre-approved low-risk actions: inspection routing, coating pauses when a window drifts, weld parameters inside the WPS envelope, robot path variants tested in simulation | Approves class-critical seam changes, lift plans and block release | Graduated autonomy, after audited accuracy and ROI |
| L4 · Bounded | Supervised work sequencing and weld adaptation for qualified block types, across processes and yards | Sets the envelope; reviews the shift record and the evaluation results | Planned; after class, yard and insurer acceptance is earned |
Straight answers
The questions production directors, welding engineers and class-compliance leads ask in the first meeting.
Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the qualified WPS, coating, dimensional and schedule constraints, and only at the autonomy level your yard has set. Design partners start in shadow mode, where Hullira writes nothing. Class-critical seam changes, lift plans and block release stay with named people.
Control returns to the robot controller, PLC or planner's last known-good state. Hullira is a supervisory layer on top of the controllers and interlocks you already run, never a replacement for them, so an outage degrades the process to its current way of running, not to a stop.
Advisory recommendations start from the physics-based twin, the WPS and the block drawings in the first weeks. Defect, distortion and coating prediction improve as block history and labelled NDT and surveyor outcomes accumulate. Onboarding is sized at 100 to 500 GPU-hours per yard and 50,000 to 250,000 synthetic variants per vessel class, both design targets.
Only if you choose cloud training. Drawings, WPS and PQR, naval data, process models and quality records are isolated per tenant and never used to train another customer's models. Security is defense and ITAR-aware, a fully on-prem deployment at the yard edge is available for naval and regulated yards, and federated learning across yards is planned and waits on data-rights agreements.
You are, the same as with any procedure change, which is why every write is policy-checked, bounded, logged and reversible, and why anything above your risk threshold waits for a named approver. The audit log records the request, the evidence, the WPS or class citation applied and the human decision.
A paid pilot on one process, scoped to a single wedge with a success metric written into the order form: weld rework, fairing hours, coating non-conformance, dock days or class-approval cycle time. Shadow mode comes first and the baseline is measured from your own records. We do not publish a pilot length because we have not run one.
Make the first scenario real
Start with one welding, fairing, coating or erection process and one measurable baseline. A paid pilot on weld inspection, distortion control or coating assurance shows the number before you commit further.