Partners

The channel is the equipment already in the yard.

Hullira's distribution plan runs through the companies already on the yard floor: welding-robot and cutting OEMs, CAD/CAM vendors, laser-scan, NDT and coating-equipment vendors, classification societies, yard-software providers and the integrators who connect them. The programme opens with the design-partner cohort; nothing here is a signed partnership.

OEMs · class · MESProgramme plannedNo signed partners claimed

run_4b7e19 · agent graph · block B-214 · scenario 10 nodes · 1 approval gate
01 · orchestrator ingest.package ✓ SUCCEEDED 02 · aligna twin.simulate ✓ SUCCEEDED 03 · cut_profile cut.nest ✓ SUCCEEDED 04 · panel_weld weld.sequence ✓ SUCCEEDED 05 · orchestrator approve.human ◆ APPROVAL 06 · quality_anomaly inspect.fuse ✓ SUCCEEDED 07 · fair_form fair.lineheat ✓ SUCCEEDED 08 · blast_coat coat.window ✓ SUCCEEDED 09 · schedule_yard dock.reoptimise ✓ SUCCEEDED 10 · erect_align erect.align ✓ SUCCEEDED

Illustrative scenario: Block B-214 · double-bottom block · panel line PL-2 · dock D1, one block, one approval gate

Partner types

Who fits, and how

How each kind of partner fits the plan.

Welding-robot and cutting OEMs

Robots, power sources, cutting machines

Equipment shipped Hullira-ready, with the controller tags, limits and WPS envelope declared at the factory. The agent runs on the OEM machine; the OEM keeps the machine relationship.

CAD/CAM and yard-software vendors

Nesting, planning, MES, scheduling

Nests and drawings in, genealogy and the optimised plan written back into the system of record. Evidence packets for class and naval review.

Scan, NDT and coating vendors

Laser scan, X-ray and UT, coating instruments and cells

Station data fused into Quality-and-Anomaly. The vendor keeps the measurement; Hullira adds the prediction, the root cause and the cited disposition.

Classification societies

ABS, DNV, LR, ClassNK

Assurance readiness for the audit trail, the cited disposition and the as-built evidence the surveyor reviews. A readiness conversation, not an approval claim.

Integrators

OT, yard networks, robot cells

Connection, tag inventory, robot cells and the shadow-mode phase of a pilot, delivered by people the yard already trusts.

Shipbuilders

Design partners

The first two to four yards shape the roadmap and get written access terms. See the customers page.

How it works

What a partner does and gets

The outline of the programme as planned.

A partner does

  • Declares the tags, limits, envelopes and interfaces on the systems they ship or support
  • Co-delivers the shadow-mode and assist-mode phases of a pilot
  • Brings a yard with a metric and a signed baseline

A partner gets

  • A Hullira-ready designation for the machine, station or system, once the connector is proven
  • A share of the Process and Yard subscription on yards they bring
  • Early access to the SDK and the twin for their own engineering
Integrations

It speaks yard, not cloud

Hullira reads and writes through the systems already on the floor. No rip and replace, no parallel historian, no new HMI to learn. Vendor names are examples of systems found in yards, not certified integrations; connector availability is confirmed per site.

CAD/CAM and nesting

Shipyard CAD/CAM and production planning (Siemens NX Shipbuilding, Dassault CATIA and 3DEXPERIENCE, AVEVA Marine, SSI ShipConstructor, NAPA class systems)

Nests, drawings, as-designed geometry; guarded cut-program writes

Welding robots and power sources

Welding robots and weld-parameter controllers (Pemamek, Kranendonk, IMG, Fronius, Lincoln Electric, Panasonic class systems)

Parameter and sequence reads; writes inside the WPS envelope

Laser scan and photogrammetry

Dimensional and accuracy-control systems (Hexagon, FARO, BuildIT class tools)

Point clouds per block and stage; as-built registration

NDT

X-ray and UT stations and service houses (Waygate, Evident class systems)

Scans and indications per joint; routing and holds

Coating instruments and cells

Environmental sensors, dry-film gauges, robotic blast and spray systems

Humidity, dew point, steel temperature, thickness; cell pause and resume

Cranes, docks and transporters

Crane telemetry, dock and berth plans, block transporters

Capacity and position reads; plans under planner approval

Yard MES and scheduling

Yard MES, scheduling and twin systems (Siemens, Dassault, AVEVA, iBASEt, Aras, in-house systems)

Work packages, block genealogy, disposition write-back

Class and procedure documents

WPS and PQR, ABS, DNV, LR and ClassNK rules, IMO PSPC, naval quality specs

Tenant-isolated retrieval with citations

See all integrations

Run timeline · scenario

One scenario run, step by step

Every Hullira run is an ordered, inspectable sequence. This is run_4b7e19 on Block B-214 · double-bottom block · panel line PL-2 · dock D1. Scenario completes in 10 steps with one approval gate. Predicted distortion at the erection joint fell from 4.2 mm to 1.8 mm after a back-step sequence, one porosity precursor on seam S-31 was cleared inside the WPS envelope, the ballast-tank coat ran inside a 3.4 °C dew-point margin, and the block landed at 1.6 mm with its conformance record written.

run_4b7e19 Block B-214 · double-bottom block · panel line PL-2 · dock D1 illustrative scenario SUCCEEDED
  1. 01 ingest.package SUCCEEDED 0.8 s

    Yard Orchestrator · Pulled the work package for B-214 from the yard MES: 46 plates, 212 seams under WPS-117, erection tolerance 2 mm at the D1 joint, PSPC-grade ballast-tank coating, erection slot on D1 in the dock plan. Locked the qualified WPS envelope and the class scope.

  2. 02 twin.simulate SUCCEEDED 1 m 12 s

    Ship Twin · Simulated 18 candidate weld sequences on the as-built twin with the weld-thermal surrogate, ranked on predicted distortion at the erection joint, crane reach on D1 and shift takt. Standing sequence predicts 4.2 mm; candidate #6 predicts 1.8 mm.

  3. 03 cut.nest SUCCEEDED 3 m 40 s

    Cut-and-Profile · Released the nest for 46 plates on CL-1 with the fit-up gaps candidate #6 assumes. As-cut geometry logged per plate and handed to the panel line; material yield 91.4% against the nest plan.

  4. 04 weld.sequence SUCCEEDED 2 m 05 s

    Panel-and-Weld · Loaded the back-step sequence for the non-critical seams on PL-2 and set heat input and travel speed inside WPS-117. Weld-pool and seam cameras streaming on 12 channels.

  5. 05 approve.human APPROVAL 58 s

    Yard Orchestrator · Candidate #6 also re-orders two class-critical butt seams, S-31 and S-32. Sequence changes on class-critical seams stay with a human, so the step was held for the shift welding engineer and approved at 06:12:44.

  6. 06 inspect.fuse SUCCEEDED continuous

    Quality-and-Anomaly · Twelve weld cameras and the UT station fused at the yard edge. One porosity precursor on S-31 at 06:41 flagged and cleared by a 4% wire-feed trim inside the WPS-117 envelope; the joint was routed to UT and passed.

  7. 07 fair.lineheat SUCCEEDED 4 m 30 s

    Fair-and-Form · Post-weld scan registered against the twin: 2.1 mm at the erection joint. Two line-heating passes planned on the inner bottom and executed by the fairing crew; re-scan read 1.8 mm, inside the 2 mm tolerance.

  8. 08 coat.window SUCCEEDED continuous

    Blast-and-Coat · Ballast-tank blast and first coat scheduled to a window with steel temperature 3.4 °C above dew point. Dry-film thickness read 312 µm against a 280 µm minimum on the stripe coats; PSPC evidence assembled per area.

  9. 09 dock.reoptimise SUCCEEDED 41 s

    Schedule-and-Yard · Re-solved the D1 dock and crane plan with B-214 ready 6 hours early and a neighbouring block late: erection slot pulled forward one shift, crane G2 reassigned, no berth conflict. Planner approved the revised plan.

  10. 10 erect.align SUCCEEDED 1 h 48 m

    Erect-and-Align · Both blocks scanned on D1 and registered against the twin; fit predicted at 1.6 mm. Shimming guidance issued to the erection crew, block landed and welded out, final scan 1.6 mm. Conformance record written: welds, scans, coating readings, approvals and class evidence for B-214.

Accelerated computing

Physical AI, at the arc

A weld pool is decided in milliseconds and a dock waits by the hour. Perception has to be local, deterministic and fast, so Hullira runs GPU inference at the yard edge and keeps training, simulation and optimisation in the cloud or on-prem.

Jetson Orin · DeepStream · Holoscan · TensorRT

Edge perception

6 to 24 cameras per process area plus UT, X-ray, thermal, laser-scan, photogrammetry, robot and coating-instrument streams fused at the yard edge. Sub-50 ms weld alerts and sub-150 ms coating or scan prompts are the design targets. Jetson Thor is planned for higher camera density.

Triton · NIM

Model serving

Weld-defect, distortion-risk, coating-risk, point-cloud and schedule-risk models behind one orchestrator at the yard edge, versioned with rollback, routed by latency, tenant, sensitivity and cost.

DGX or HGX · NeMo

Training

Weld-defect vision, UT and X-ray classification, NeMo class-rule reasoning and weld-thermal FEA surrogates fine-tuned per tenant: 100 to 500 GPU-hours per yard during onboarding, then monthly retraining from engineer corrections and class outcomes. Dedicated training capacity is planned.

Omniverse · OVX · Modulus

Ship and yard twin

Block erection, weld sequence, robot reach, crane paths and yard layout simulated before the shift, as-built against as-designed. GPU weld-thermal and structural FEA is the workload; physics-informed surrogates rank plans at shift cadence.

Cosmos · Omniverse Replicator

Synthetic data

Rare weld defects, coating failures, distortion modes, occluded seams and erection misalignment cases generated and validated against real NDT and scan distributions before promotion. 50k to 250k variants per vessel class is the target. Planned.

cuOpt

Optimisation

Dock, crane and berth schedules, work-package sequencing, yard logistics and erection order, re-solved as progress changes.

Isaac · Isaac ROS

Robot cells and crawlers

Robotic weld, blast, coat and inspection cells and crawler or drone hull inspection, with paths validated in simulation before they run next to a hull.

RAPIDS

GPU ETL

Telemetry ETL across weld parameters, scans, NDT results, coating readings, non-conformance and schedule history, for retraining, drift detection and rework, dock-time and schedule benchmarks.

NeMo Guardrails · Retriever

Policy and grounding

WPS and PQR, class-rule, PSPC, cyber and human-approval policies enforced before any action writes back to robots, MES, QA or work packages; retrieval with citations and tenant isolation.

FAQ

Straight answers

The questions production directors, welding engineers and class-compliance leads ask in the first meeting.

Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the qualified WPS, coating, dimensional and schedule constraints, and only at the autonomy level your yard has set. Design partners start in shadow mode, where Hullira writes nothing. Class-critical seam changes, lift plans and block release stay with named people.

Get started

Talk about partnering

Tell us what you ship or support and which yards run it.