Pricing

Priced per process. Justified per block.

Process, Yard and Enterprise. The Process tier covers one control or inspection module on one production process or area. Yard covers the whole yard. Enterprise is for multi-yard groups and naval programs. Annual prepay carries a 15 to 20% discount and outcome components are available on rework, dock time and schedule value.

Process · $12,000 per process / monthYard · $85,000 / monthEnterprise · $700k to $10M ACV

Packaging logic

Land, expand, monetise the value

  1. Land. Low-friction entry on one process with a clear ROI metric, on the Process tier.
  2. Expand. Processes, yards, group sites and autonomy level, into Yard and Enterprise.
  3. Monetise value. Usage and outcome pricing on rework, dock time and schedule value capture upside as the agent does more of the work.

Floor pricing is protected. Discounts are traded for term length and a reference; naval and class-flagship references are the ones that matter.

Pricing

Priced per process, per yard, per group

Land on one workflow with a measured baseline. Expand by process, yard, group site and autonomy level. Outcome components are available on rework, dock time and schedule value. Annual prepay carries a 15 to 20% discount.

Billing period
Process $12,000 per production process or area / month · billed monthly

Weld, fairing or coating control, or weld-inspection AI, for one process. For yards validating ROI on the wedge.

  • One process or area, one agent module
  • Yard-edge inference node included
  • Robot, instrument and MES reads, guarded writes
  • Run log, audit trail, block genealogy
  • Business-hours support
Start a pilot
Enterprise Custom land $700k to $10M ACV

Multi-yard groups and naval programs standardising on Hullira, with custom weld, distortion and schedule models.

  • Multi-yard and program fleet management
  • Custom weld, distortion and schedule models
  • Yard-edge fleet with on-prem option
  • Group autonomy policy and approval chains
  • SLAs, SSO and RBAC, dedicated engineer
Contact us
Compare

What is in each tier

Products are licensed per process on the Process tier and bundled on Yard and Enterprise.

What is in each tier
CapabilityProcessYardEnterprise
Processes covered1All in the yardAll in the group
Agent modules1 of 5 productsAll agentsAll agents + custom models
As-built ship twin (Aligna)NoIncludedCustom vessel-class twins
Dock optimisation (Dockos)NoIncludedGroup and program scheduling
Yard-edge nodeIncludedPer process areaFleet managed
Guarded controller writesScoped tagsAll scoped tagsGroup policy
Block genealogyIncludedIncludedIncluded + class evidence packets
Autonomy levelsL1 to L2L1 to L3L1 to L4 when accepted
SSO and RBACNoPlannedPlanned, with approval chains
On-prem deploymentNoOptionalIncluded
SupportBusiness hours24/724/7 + named engineer
Indicative price$12,000/mo$85,000/mo$700k to $10M ACV
ROI

The arithmetic a yard runs

We do not publish savings percentages because we have not measured any yet. These are the inputs a yard brings to the pilot baseline, and the outputs the pilot measures.

Inputs you already have

  • Weld rework and class-rejected welds per block, with the defect type behind each
  • Fairing hours and out-of-tolerance blocks per block type
  • Coating non-conformance and re-coat area per PSPC area
  • Dock hours per erection join and re-cut or re-fair events
  • Dock, crane and berth slips per month and the day rate of the dock
  • Clashes found after steel closed and the rework behind them

What the pilot measures

  • Weld-defect, distortion, dimensional and coating prediction accuracy against the NDT and surveyor baseline on the wedge workflow
  • Rework reduction and first-time-quality improvement
  • Dock-day reduction and schedule-slip reduction
  • Class-approval cycle time
  • A hard ROI metric tied to the Process price
  • Conversion of the design partner to paid
Run timeline · scenario

What you are actually buying

A run engine that produces this record on every block, every shift, on every process you license.

run_4b7e19 Block B-214 · double-bottom block · panel line PL-2 · dock D1 illustrative scenario SUCCEEDED
  1. 01 ingest.package SUCCEEDED 0.8 s

    Yard Orchestrator · Pulled the work package for B-214 from the yard MES: 46 plates, 212 seams under WPS-117, erection tolerance 2 mm at the D1 joint, PSPC-grade ballast-tank coating, erection slot on D1 in the dock plan. Locked the qualified WPS envelope and the class scope.

  2. 02 twin.simulate SUCCEEDED 1 m 12 s

    Ship Twin · Simulated 18 candidate weld sequences on the as-built twin with the weld-thermal surrogate, ranked on predicted distortion at the erection joint, crane reach on D1 and shift takt. Standing sequence predicts 4.2 mm; candidate #6 predicts 1.8 mm.

  3. 03 cut.nest SUCCEEDED 3 m 40 s

    Cut-and-Profile · Released the nest for 46 plates on CL-1 with the fit-up gaps candidate #6 assumes. As-cut geometry logged per plate and handed to the panel line; material yield 91.4% against the nest plan.

  4. 04 weld.sequence SUCCEEDED 2 m 05 s

    Panel-and-Weld · Loaded the back-step sequence for the non-critical seams on PL-2 and set heat input and travel speed inside WPS-117. Weld-pool and seam cameras streaming on 12 channels.

  5. 05 approve.human APPROVAL 58 s

    Yard Orchestrator · Candidate #6 also re-orders two class-critical butt seams, S-31 and S-32. Sequence changes on class-critical seams stay with a human, so the step was held for the shift welding engineer and approved at 06:12:44.

  6. 06 inspect.fuse SUCCEEDED continuous

    Quality-and-Anomaly · Twelve weld cameras and the UT station fused at the yard edge. One porosity precursor on S-31 at 06:41 flagged and cleared by a 4% wire-feed trim inside the WPS-117 envelope; the joint was routed to UT and passed.

  7. 07 fair.lineheat SUCCEEDED 4 m 30 s

    Fair-and-Form · Post-weld scan registered against the twin: 2.1 mm at the erection joint. Two line-heating passes planned on the inner bottom and executed by the fairing crew; re-scan read 1.8 mm, inside the 2 mm tolerance.

  8. 08 coat.window SUCCEEDED continuous

    Blast-and-Coat · Ballast-tank blast and first coat scheduled to a window with steel temperature 3.4 °C above dew point. Dry-film thickness read 312 µm against a 280 µm minimum on the stripe coats; PSPC evidence assembled per area.

  9. 09 dock.reoptimise SUCCEEDED 41 s

    Schedule-and-Yard · Re-solved the D1 dock and crane plan with B-214 ready 6 hours early and a neighbouring block late: erection slot pulled forward one shift, crane G2 reassigned, no berth conflict. Planner approved the revised plan.

  10. 10 erect.align SUCCEEDED 1 h 48 m

    Erect-and-Align · Both blocks scanned on D1 and registered against the twin; fit predicted at 1.6 mm. Shimming guidance issued to the erection crew, block landed and welded out, final scan 1.6 mm. Conformance record written: welds, scans, coating readings, approvals and class evidence for B-214.

Segments

Which plan fits

Commercial newbuild, naval and defense, repair and conversion, multi-yard groups and the OEMs that ship into the yard. Most yards pick one process and one wedge, prove the number, then expand.

Commercial newbuildTankers, bulkers, containerships, gas carriers, ferries, offshore

Commercial newbuild

Series vessels with repeat block geometries, where weld rework and fairing hours are already counted. Weldra on the panel line or Fairix on the block type that distorts most.

Naval and defenseProgram schedules, class and naval specs

Naval and defense

Naval shipbuilders under classification-society and naval quality specs with program-office and cyber approvers. Weldra inspection and the Aligna twin, deployed on-prem, with the conformance record from day one.

Repair, conversion and drydockingDock days are the cost

Repair, conversion and drydocking

Yards where the dock is the business and a coating or alignment fault is measured in dock days. Coatiq in the ballast tanks and Dockos on the dock plan.

Multi-yard groups and naval programsOne policy, many yards

Multi-yard groups and naval programs

Groups standardising weld, distortion and schedule models across sites, with the Enterprise tier, fleet-managed yard edge and per-yard private models.

OEMs that ship into the yardWelding robots, coating equipment, scanning, NDT

OEMs that ship into the yard

Welding-robot, CAD/CAM, laser-scan, NDT and coating OEMs embedding Hullira-ready autonomy in what they already sell.

Guardrails

An agent that can move a weld parameter needs a leash

Hullira writes to production equipment. Every capability is scoped, every write is policy-checked against the qualified WPS, class and PSPC constraints, and every action is written to an append-only audit log the yard owns.

  • Bounded action space. Each agent writes only to an explicit tag allow-list, inside per-tag rate and magnitude limits and the qualified WPS, coating, dimensional and schedule constraints for the block.
  • Policy engine before every write. WPS and PQR, class rules, PSPC, safety limits, role permissions, autonomy level and human-approval requirements are evaluated before a parameter moves. NeMo Guardrails is the design for this layer.
  • Human-in-the-loop gates. Class-critical seam changes, lift plans, block release and class evidence wait for a named approver. Robots adapt only inside pre-approved WPS envelopes until class, yard and insurer acceptance supports more.
  • Immutable audit log. Append-only, assurance-grade and exportable. Every action records source evidence, the WPS, class or PSPC citation applied, confidence, estimated rework, dock-time and schedule impact, rollback path, approver and block scope.
  • Hard fallback. Loss of the edge node, the network or a model returns control to the robot controller, PLC or planner's last known-good state. Interlocks are never in Hullira's path.
  • Tenant and defense-aware isolation. Drawings, WPS, naval data, models and memory never cross a customer boundary. Security is defense and ITAR-aware, and on-prem or yard-edge deployment is available for naval and regulated yards.

Compliance posture

Compliance and certification status
ItemScopeStatus
SOC 2 Type ICloud control plane QUEUED Planned, first 6 months, with a defense and ITAR-aware review
SOC 2 Type IICloud control plane QUEUED Planned, 6 to 12 months
SSO and RBACConsole and approvals QUEUED Planned, 6 to 12 months
Class-society and defense assurance packagesDisposition and genealogy evidence QUEUED Planned, 6 to 12 months; not a class approval or certification claim
Cited reasoningWPS and PQR, ABS, DNV, LR, ClassNK, IMO PSPC, naval specs RUNNING In the design, every answer cites its source
Per-tenant and IP isolationDrawings, WPS, naval data, models, memory RUNNING In the design from day one
On-prem and yard-edge deploymentNaval and regulated yards RUNNING Design option

Read the security overview

Enterprise

Standardise autonomy across the group

One policy model, one audit trail, one benchmark across every process in every yard, with the weld, distortion and schedule models kept private to each site and each naval program.

Talk to us Enterprise details

  • SSO and role-based access down to the tag level, planned for the 6 to 12 month release
  • Group-wide autonomy policy with per-yard override and approval chains
  • Cross-yard benchmarking on rework, fairing hours, coating non-conformance, dock days and schedule slips
  • On-prem and yard-edge deployment, defense and ITAR-aware, for naval and regulated yards
  • Edge autonomy that survives control-plane loss by returning to the controller's last known-good state
  • Dedicated deployment engineer and quarterly model review per yard
FAQ

Straight answers

The questions production directors, welding engineers and class-compliance leads ask in the first meeting.

Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the qualified WPS, coating, dimensional and schedule constraints, and only at the autonomy level your yard has set. Design partners start in shadow mode, where Hullira writes nothing. Class-critical seam changes, lift plans and block release stay with named people.

Get started

Start with one process

Start with one welding, fairing, coating or erection process and one measurable baseline. A paid pilot on weld inspection, distortion control or coating assurance shows the number before you commit further.